返回列表 发帖

[转帖]10月15上午西安

刚贴了半天,一上传居然全没了,今天果真比较背。

AA 数据统计表明今后的学龄人数会上涨,所以college-level teaching 的工作也会好找了

AI you can tell idears of a nation by its advertisements.

math:

1.In warehouse there are some boxes divided in stacks, each has 12.After adding 60 more, each has 14.How many boxes before adding?

1)boxes<110 before adding

2)boxes<120 after adding

2. 一个等腰三角形,问周长

1)一个角是120

2)面积是64倍的根号3

vable

reading:全是jj里的,但题目有变化。

这个是一片的原文

In 1975 Chinese survey teams

remeasured Mount Everest, the highest

of the Himalayan mountains. Like the

Line  British in 1852, they used the age-old

(5) technique of “carrying in” sea level:

      surveyors marched inland from the

      coast for thousands of miles, stopping

      at increments of as little as a few feet

      to measure their elevation, and mark-

(10) ing each increment with two poles.

To measure the difference in elevation

between poles, surveyors used an

optical level-a telescope on a level

base-placed halfway between the

(15) poles. They sighted each pole, read-

ing off measurements that were then

used to calculate the change in eleva-

tion over each increment. In sight of

the peaks the used theodolites-

(20) telescopes for measuring vertical and

       horizontal angles-to determine the

       elevation of the summit.

The Chinese, however, made

efforts to correct for the errors that

(25) had plagued the British. One source

of error is refraction, the bending of

light beams as they pass through air

layers of different temperature and

pressure. Because light traveling.

(30) down from a summit passes through

many such layers, a surveyor could

sight a mirage rather than the peak

itself. To reduce refraction errors, the

Chinese team carried in sea level to

(35) within five to twelve miles of Everest’s

       summit, decreasing the amount of air

that light passed through on its way to

their theodolites. The Chinese also

launched weather balloons near their

(40) theodolites to measure atmospheric

temperature and pressure changes

to better estimate refraction errors.

Another hurdle is the peak’s shape.

When surveyors sight the summit.

(45) there is a risk they might not all

measure the same point. In 1975

the Chinese installed the first survey

beacon on Everest, a red reflector

visible through a theodolite for ten

(50) miles, as a reference point. One

more source of error is the uneven-

ness of sea level. The British

assumed that carrying in sea level

would extend an imaginary line from

(55) the shore along Earth’s curve to a

point beneath the Himalaya. In

reality, sea level varies according

to the irregular interior of the planet.

The Chinese used a gravity meter to

correct for local deviations in sea level.

36.2.D岛的主要一种农作物,姑且是P吧,是主要出口的,空运到全世界保持新鲜,今年岛东边发了大洪水,颗粒无收,但岛西边阳光普照,好的不得了,可是岛西边的农民收入还是降低了,问如何解释  我选洪水冲垮了桥梁和公路,岛内也要空运
37.3.某人想申请U公司的职位,但U招的人不多,应聘的不少,比率将近1/100,所以这个鸟人不想申请了(软骨头),Weaken他  我选这鸟人的资历比其他应聘者高

考得太差,欲哭无泪,现在想来大概前面做得太快了吧。

现在要去发会呆了,刚写了一大堆的话,结果没传上去,现在连重写一遍的力气都没有了。

但祝福还是要重写的!blessing!

收藏 分享
smart@topway.org

返回列表

站长推荐 关闭


美国top10 MBA VIP申请服务

自2003年开始提供 MBA 申请服务以来,保持着90% 以上的成功率,其中Top10 MBA服务成功率更是高达95%


查看