返回列表 发帖

885 sec 4-19

19. To help preserve ancient Egyptian monuments threatened by high water tables, a Swedish engineering firm has proposed installing pumps, perhaps solar powered, to lower the underground water level and dig trenches around the bases of the stone walls.

(A) to lower the underground water level and dig trenches

(B) to lower the underground water level and to dig trenches

(C) to lower the underground water level and digging trenches

(D) that lower the underground water level and that trenches be dug

(E) that lower the underground water level and trench digging

没人问过。

答案是C。后面的digging trenches是什么成分啊?

收藏 分享

thanks !!

TOP

返回列表

站长推荐 关闭


美国top10 MBA VIP申请服务

自2003年开始提供 MBA 申请服务以来,保持着90% 以上的成功率,其中Top10 MBA服务成功率更是高达95%


查看