返回列表 发帖

[求助]GMATPrep数学一道,不懂!!

A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments S1, S2, S3 and S4 combined, as shown in the table above. What is the expected number of defective chips in a shipment of 60000chips?


S1>2>5000

S2>5>12000

S3>6>18000

S4>4>16000

(第一列为比率代号,第二列为number of defective chips in the shipment,第三列为total number of chips in the shipment)

A.14

B.20

C.22

D.24

E.25

收藏 分享

了解,感谢!!

TOP

题目说d/total =s1~s4的全部d/total   所以17/51000=?/60000  可解出?=20   选b

TOP

返回列表

站长推荐 关闭


美国top10 MBA VIP申请服务

自2003年开始提供 MBA 申请服务以来,保持着90% 以上的成功率,其中Top10 MBA服务成功率更是高达95%


查看