返回列表 发帖
GWD-TN-15-3.
Highway Official: When resurfacing our concrete bridges, we should use electrically conductive concrete (ECC) rather than standard concrete. In the winter, ECC can be heated by passing an electric current through it, thereby preventing ice buildup. The cost of the electricity needed is substantially lower than the cost of the deicing salt we currently use.

Taxpayer: But construction costs for ECC are much higher than for standard concrete, so your proposal is probably not justifiable on economic grounds.

Which of the following, if true, could best be used to support the highway official’s proposal in the face of the taxpayer’s objection?

A.        The use of de-icing salt causes corrosion of the reinforcing steel in concrete bridge decks and damage to the concrete itself, thereby considerably shortening the useful life of concrete bridges.
B.        Severe icing conditions can cause power outages and slow down the work of emergency crews trying to get power restored.
C.        In weather conditions conducive to icing, ice generally forms on the concrete surfaces of bridges well before it forms on parts of the roadway that go over solid ground.
D.        Aside from its potential use for de-icing bridges, ECC might also be an effective means of keeping other concrete structures such as parking garages and airport runways ice free.
E.        If ECC were to be used for a bridge surface, the electric current would be turned on only at times at which ice was likely to form.

分类:
看原文:
前提1(隐含假设):
前提2(事实):
总结论(推测):
找答案:
TEST:
模型或要素:新材料、运行成本、建筑成本、副作用、寿命

TOP

返回列表

站长推荐 关闭


美国top10 MBA VIP申请服务

自2003年开始提供 MBA 申请服务以来,保持着90% 以上的成功率,其中Top10 MBA服务成功率更是高达95%


查看