- 精华
- 0
- 积分
- 1141
- 经验
- 1141 点
- 威望
- 0 点
- 金钱
- 1875 ¥
- 魅力
- 1141
|
请教大全362
362. In a plan to stop the erosion of East Coast beaches, the Army Corps of Engineers proposed building parallel to shore a breakwater of rocks that would rise six feet above the waterline and act as a buffer, so that it absorbs the energy of crashing waves and protecting the beaches.
(A) act as a buffer, so that it absorbs
(B) act like a buffer so as to absorb
(C) act as a buffer, absorbing
(D) acting as a buffer, absorbing(C)
(E) acting like a buffer, absorb
我问的是题外话:
句中的parallel to shore是不是形容词短语修饰breakwater,但因为breakwater后面有复杂的修饰成份所以parallel to shore前置了?
如果是,大家还看见过类似的句子吗? |
|