Board logo

标题: Feifei 23 -请nn赐教 [打印本页]

作者: 憨憨    时间: 2006-7-14 07:00     标题: Feifei 23 -请nn赐教

23. On a certain day, nine scheduled flights on Swift Airlines were canceled. Ordinarily, a cancellation is due to mechanical problems with the airplane scheduled for a certain flight. However, since it is unlikely that Swift would have the mechanical problems with more than one or two scheduled flights on a single day, some of the nine cancellations were probably due to something else.

The argument depends on which one of the following assumptions? A

 

A.        More than one or two airplanes were scheduled for the nine canceled flights.

B.        Swift Airlines has fewer mechanical problems than do other airlines of the same size.

C.        Each of the canceled flights would have been longer than the average flight on Swift Airlines.

D.       Swift Airlines had never before canceled more than one or two scheduled flights on a single day.

All of the airplanes scheduled for the canceled flights are based at the same airport.

这道题貌似很简单,但是觉得就是想不通,请NN赐教!不盛感激


作者: kallyli    时间: 2006-7-14 14:36

注意airplane和flight的区别,一架飞机可以飞多个航班。所以如果只有两架飞机正好都飞这九个航班,而这两架飞机都有机械故障,岂不是还是由于这个原因引起的么。
作者: luoye1    时间: 2006-7-15 19:43

didn't I answer this question in another thread?

same airplane can be used for several flights in ONE day.






欢迎光临 国际顶尖MBA申请交流平台--TOPWAY MBA (http://forum.topway.org/) Powered by Discuz! 7.2