Board logo

标题: OG12-63 关于at least的小问题 [打印本页]

作者: dypig1234    时间: 2011-11-12 07:05     标题: OG12-63 关于at least的小问题

The yield of natural gas from Norway’s Troll gas fi eld is
expected to increase annually until the year 2005 and
then to stabilize at six billion cubic feet a day, which
will allow such an extraction rate at least for 50 years’
production.
(A)  2005 and then to stabilize at six billion cubic
feet a day, which will allow such an extraction
rate at least for
(B)  2005 and then to stabilize at six billion cubic
feet a day, an extraction rate that will allow at
least
答案选B,没什么问题
不过想问问大家,at least后面要不要加for然后再加时间啊?
作者: cherryserena    时间: 2011-11-13 06:51

B,里面的allow是及物动词, allow 50years' production. 和at lease

无关
作者: dypig1234    时间: 2011-11-15 06:35

谢谢回复,不过还不是很懂。。




欢迎光临 国际顶尖MBA申请交流平台--TOPWAY MBA (http://forum.topway.org/) Powered by Discuz! 7.2