标题: GWD1-26 [打印本页]
作者: sunny9653 时间: 2010-1-16 07:50 标题: GWD1-26
Q26:
Running at their respective constant rates, machine X takes 2 days longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5/4 w widgets in 3 days, how many days would it take machine X alone to produce 2w widgets?
A. 4
B. 6
C. 8
D. 10
E. 12Answer: E How to calculate?
Answer: E How to calculate?
作者: aster2009 时间: 2010-1-16 21:18
设X用X天完成W,则Y需要X-2天。 (1/x+1/(x-2))*3=5/4,求得X=6。
完成2W的时间则为12
作者: sunny9653 时间: 2010-1-18 18:55
这个方程解不出来呢?
欢迎光临 国际顶尖MBA申请交流平台--TOPWAY MBA (http://forum.topway.org/) |
Powered by Discuz! 7.2 |