Board logo

标题: [求助]GWD-MATH01-26 [打印本页]

作者: Avantasia    时间: 2009-6-19 07:11     标题: [求助]GWD-MATH01-26

Running at their respective constant rates, machine X takes 2 days longer to produce w widgets than machine Y.  At these rates, if the two machines together produce 5/4 w widgets in 3 days, how many days would it take machine X alone to produce 2w widgets?

请教大家这道题怎么做啊?

谢谢大家


作者: BruceNornia    时间: 2009-6-19 10:53

列方程解答就行啊

 

假设X机器的工作效率是 x widgets/ day, Y机器为 y widgets/ day

那么 machine X takes 2 days longer to produce w widgets than machine Y 这句话可以描述为: w/x - w/y = 2

而  two machines together produce 5/4 w widgets in 3 days 这句话可以描述为: [5/4 w] / (x + y) = 3

 

用w把x 和 y标示出来 得到: x = w/6 y=w/4 (省略计算过程) 

那么用机器X单独造2w个widget需要 12天。

 


作者: yahooww    时间: 2009-6-19 21:43

我设了两个方程 :

1.    x-2 = y

2.    (1/x + 1/y) * 3 = 5/4


1 带入 2 , 可方程解出来的不是整数,不知道大家怎么做这道题?






欢迎光临 国际顶尖MBA申请交流平台--TOPWAY MBA (http://forum.topway.org/) Powered by Discuz! 7.2