- 精华
- 0
- 积分
- 2100
- 经验
- 2100 点
- 威望
- 209 点
- 金钱
- 209 ¥
- 魅力
- 209
|
OG12-65 请NN们解答
65. In a plan to stop the erosion of East Coast beaches,
the Army Corps of Engineers proposed building
parallel to shore a breakwater of rocks that would rise
six feet above the waterline and act as a buffer, so
that it absorbs the energy of crashing waves and
protecting the beaches.
(A) act as a buffer, so that it absorbs
(B) act like a buffer so as to absorb
(C) act as a buffer, absorbing
(D) acting as a buffer, absorbing
(E) acting like a buffer, absorb
答案肯定没大的争议 ABSORBING要和后面那个PROTECTING 但是那个absorbing 感觉也有问题啊 他即可以表示是A BUFFER 吸收保护 也可以表示是 ENGINEERS 那不就是CONFUSING了嘛??? 求牛人解答!!! |
|