标题: 求助GWD6-7关于完成时 [打印本页]
作者: hjgjfgfb 时间: 2006-11-23 06:49 标题: 求助GWD6-7关于完成时
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
- Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve
- Concerns about public health have led to the construction of three separate sewer systems between 1876 and 1904 to serve
- Concerns about public health have led between 1876 and 1904 to the construction of three separate sewer systems for serving
- There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving
- There were concerns leading between 1876 and 1904 to the construction of three separate sewer systems for serving between不是表示一个时间段,为什么不选C用完成时呢?
作者: dabiaoxun 时间: 2006-11-25 20:50
between 1876 and 1904的位置不对,意思有变。
欢迎光临 国际顶尖MBA申请交流平台--TOPWAY MBA (http://forum.topway.org/forum/) |
Powered by Discuz! 7.2 |